Correct Survey Data

When survey data is modified, including reversing survey segment direction or rearranging segments, survey data showing in the Chart, Map, and Table panes may become out of date. When this happens, Out of Sync - Refresh Survey will appear in the Chart's title bar. Click to refresh the survey and load the updated data in all of the panes.

Add New Comments to a Data Point

  • In the Table pane — Double-click in the Remarks cell for that data point's row and enter the desired comment.

  • In the Chart pane — Add new comments to a data point. Refer to Add a Comment to Chartfor additional information.

Edit Existing Comments for a Data Point

  • In the Table pane — Double-click in the Remarks cell for that data point's row, delete the existing text, and enter the desired comment.

  • In the Chart pane — Edit an existing comment for a survey data point. Refer to Add a Comment to Chartfor additional information.

Associate a Known Engineering Station with a Data Point

  • In the Chart pane — Associates a data point with a specific engineering station known to your company. Refer to Add or Remove Station Value for additional information.

Interpolate GPS

  • In the Chart pane — Rubber-bands all data points between two known GPS coordinates. Refer to Interpolate GPS for additional information.

Connect a Waveprint to a Data Point

  • In the Chart pane — Link a waveprint to a specific data point. Refer to Waveprint for additional information.

Set a Region as a Skip or Flag Spikes

Splice Survey Segments

  • Splice survey segments — If multiple survey segments contain data covering the same location, you can combine the overlapping data. The survey segment that data is spliced into will keep the merged version of the data points. The survey segment that data is spliced from will have the duplicate data points removed from survey segment. Refer to Splice Survey Segments for more information.